Project Overview
Statera Energy had commissioned the construction of a new 50MW gas-fired power station at their site in Saltholme, Stockton-on-Tees. GGP Consult were contracted to develop steel structures to be installed as modular units to speed up installation. Our remit included calculations and fabrication drawings to be produced to a tight programme during a worldwide pandemic.