Project Overview
GGP Consult have been engaged in supporting the redevelopment of an existing Arg 36,000 tonne plant, generating 500kW of electricity and 1,000m3/hr biomethane grid injection.
The redevelopment will be completed over three phases, with the first phase being a refurb of the existing plant currently in progress.
Phase two will add a new digester, gas clean up system, silage clamps and CO2 capture equipment. Before the final phase, an additional digester will be added to achieve the 1,000m3/hr biomethane.
GGP have worked on all aspects of the project, providing planning, overall master plans, civil design package for tender and construction, tender management and project management roles.