Project Overview
GGP Consult were engaged to support the development of Lords Meadow Biogas.
Using GGPs experience and knowledge within the AD sector, we were able to provide a concept layout fitting within the allocated site boundary.
A split level arrangement was adopted to provide the most efficient use of space.
The ground was cut in to form the lower containment cell with the silage clamps on a higher level using the clamp rear wall to retain the ground to the site boundary.
The facility will use energy from the surrounding farms to generate 500m3/hr biomethane grid injection.